Print Page | Close Window

2007 London CHC Applicants [SAP]

Printed From: Canada Immigration and Visa Discussion Forum
Category: Canada Immigration Topics
Forum Name: Skilled Worker / Independent Immigration
Forum Description: Permanent residence for skilled workers. The point system and related issues. Employer sponsorship is not a requirement
URL: https://secure.immigration.ca/forum/forum_posts.asp?TID=75
Printed Date: 29 Mar 2024 at 11:12am


Topic: 2007 London CHC Applicants [SAP]
Posted By: chintu
Subject: 2007 London CHC Applicants [SAP]
Date Posted: 30 Nov 2009 at 1:18pm
TIMELINE SUMMARY
[Started from November 30, 2009 from http://www.immigration.ca/discussion2/topic.asp?TOPIC_ID=25462&whichpage=120]

London CHC : [To see the LATEST Summary go to  http://www.immigration.ca/forum/forum_posts.asp?TID=75&PN=264&title=2007-london-chc-applicants-sap - PAGE 264 ]
Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
samjul- London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Updt Sent May 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA), [Updt Req Apr 2009; Updt Sent Jul 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Reqt May 2009; Updt Sent July 2009, Addt Doc Req : Aug 2009, Addt Doc sent Oct 2009; Medical Req Nov 2009]
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 (Q8)
Ashirale - London CHC - AOR Sep-2007 (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011



Replies:
Posted By: chintu
Date Posted: 30 Nov 2009 at 1:22pm
Dear Friends,

I have continued our old thread from http://www.immigration.ca/discussion2/topic.asp?TOPIC_ID=25462&whichpage=120 at the old DF. Hope everyone will keep contributing as before.



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: nina.roy
Date Posted: 30 Nov 2009 at 3:16pm
Hey Chintu, its great to see you continuing the thread.... thanks Smile

Please can you advice me on my 2 queries:

[1] Can you advice if the Medical Practitioner require original passports for taking the medical examination?

[2] I submitted my update documents on 12-Oct-09. I checked the status of my immigration file online and it says: "We started processing your application on July 19, 2007. " - does this mean that they haven't received my update documents?  - My submission deadline is tonight, should I be worried?

Many Thanks,
Nina.


-------------
There is always light at the end of the tunnel


Posted By: chintu
Date Posted: 30 Nov 2009 at 11:29pm
Dear Nina,
 
I am not sure about the passports query, but ECAS status is not a concern. I sent my documents in June 2009 and my ECAS status still shows the same as it was in Aug 2007. No change in ECAS.
 
Chintu


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: canadaboy
Date Posted: 01 Dec 2009 at 4:44am
Hi Nina and Chintu,
 
Well Nina you dont need the original passport with you when doing medical. I am going today to do medical for my self and my family. I called the DMP and they advised me to bring 3 passport size photos, passport copies and if wearing glasses thats it we need to take with us and of course the medical forms which we received from CIC london office.
 
I will update you my experience of medical.
 
Wish me luck guys
 
Regards,
canadaboy
AOR july 2007


Posted By: mowafaqb
Date Posted: 01 Dec 2009 at 4:58am
dear all
 
i got AOR on sep 2007 , so i asked london office if they sent me the update letter , after 8 days they sent me an email that they sent a letter on oct 26 to my mailing address
 
i didnt get any thing yet
 
do u think that letter is the update letter
 
kuwait
application Aug 2007
AOR 9   2007


Posted By: mowafaqb
Date Posted: 01 Dec 2009 at 7:43am
they send me the update letter by email
 
wow


Posted By: Batra
Date Posted: 01 Dec 2009 at 8:40am
Hi Guys,

I was very worried about continuing our thread but successfully our pioneer Chintu has started it again. thx Chintu.

hearty congrats to canadaboy. wish you all the best for medical step.

pls., keep posting your experience about medical test. are you going to do it in al-habib medical center in riyadh ???


Posted By: chintu
Date Posted: 01 Dec 2009 at 8:51am
Congrats Mowafaq. Start gathering all the documents.
 
Chintu


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 01 Dec 2009 at 8:53am
Thanks Batra for the kind words. I too was tensed initially when I saw the old forum had been locked. But in quick time I realized and hence created the same thread on this new forum.
 
I wished to put a message of the transition at the old DF but could not as it was LOCKED.
 
Anyways, lets hope this new DF brings us good luck too.
 
Chintu
 
Originally posted by Batra Batra wrote:

Hi Guys,

I was very worried about continuing our thread but successfully our pioneer Chintu has started it again. thx Chintu.

hearty congrats to canadaboy. wish you all the best for medical step.

pls., keep posting your experience about medical test. are you going to do it in al-habib medical center in riyadh ???


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 01 Dec 2009 at 8:55am
TIMELINE SUMMARY     [Mowafaq updated]

London CHC :

Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
samjul- London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Updt Sent May 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA), [Updt Req Apr 2009; Updt Sent Jul 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Reqt May 2009; Updt Sent July 2009, Addt Doc Req : Aug 2009, Addt Doc sent Oct 2009; Medical Req Nov 2009]
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 [Updt Req Oct 2009] (Q8)
Ashirale - London CHC - AOR Sep-2007 (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: canadaboy
Date Posted: 01 Dec 2009 at 9:35am
Thanks Batra for your wishes.....I completed today my medical test . It was very fast and yes I did from Suleman habib centre. less than 1 hour we finished all the test. There were total 4 test  Eye, blood , urine and Chest X ray ....now they said they willl call tomorrow to see the doctor and after tomorrwo they will send the report directly to CIC london.
 
@ Nina : they even did not ask for passport copies also. Only 2 photos require and the medical forms which we receive from CIC,   thats it.
 
Regards
Cboy


Posted By: nina.roy
Date Posted: 01 Dec 2009 at 2:01pm
Excellent, thanks for sharing that Canadaboy. Do you mind if I ask what profession did you apply under please? Good Luck with your medicals Smile

@Chintu: Thanks for your help too... Smile


-------------
There is always light at the end of the tunnel


Posted By: Al_Soufi
Date Posted: 01 Dec 2009 at 4:27pm

Hi every body

Well Done Chintu .. it's Great Initiative from you to keep 2007 thread alive!
 

Canada Boy ... Iam happy for you .. Congratulations buddy! ...at least i realized that CHC London did not forget us...  may God facilitate our journey and give us patience inshallah.
 
Best of Luck to all of you.
 


Posted By: canadaboy
Date Posted: 01 Dec 2009 at 4:34pm
Hi Nina,
 
Sure ...well I m an IT professional and AOR July 2007. I have done my medical and now next week I need to send RPRF draft to CIC london.. then I shall expect PPR within 2 to 3 months ....but I m not sure BC will take time or not...someone advised me that also the possibility of PPR in less than a month...So lets keep our finger crossed
 
@ Al Soufi : thanks al soufi for your wishes
 
All the very best to all of you guys
 
Regards,
canadaboy


Posted By: MOON
Date Posted: 03 Dec 2009 at 6:30am
Congratulation for new look

-------------
Mooni


Posted By: ashirale
Date Posted: 04 Dec 2009 at 4:10am
Hi Chintu, thanks for bringing us back in action!

Mowafaq....BIG CONGRATS!, I'm excited!!! (almost....) lets hope other 2007 applicants get their update request soon. Big smile
Ashirale


Posted By: ashirale
Date Posted: 04 Dec 2009 at 4:23am
OMG!...Mowafaq, I had to read your post again to fully understand it....does that mean some Sept AOR Update requests have been lost in the mail?
I'm going to email CHC right away and request them to resend.Shocked



Posted By: chintu
Date Posted: 04 Dec 2009 at 2:36pm
Thanks Al-Soufi and Ashirale for the kind words.

Chintu



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: mowafaqb
Date Posted: 05 Dec 2009 at 5:59am

ASHERALE

 

thank u , i contact some applicants on trackitt (with sep AORs) one of them told me that he send them an email to ask if they send him the update letter by mail ,they reply that the letter was sent on Oct. and they send it by email on the next day , so i did the same



Posted By: MOON
Date Posted: 06 Dec 2009 at 2:05am

Dear CB,

Congratulation for the successful steps towards your settlement in Canada

 

But tell me one thing have you received back your & spouse original academic documents from CHC London office?

 
Mn
 
QUOTE=canadaboy]Hi Nina,
 
Sure ...well I m an IT professional and AOR July 2007. I have done my medical and now next week I need to send RPRF draft to CIC london.. then I shall expect PPR within 2 to 3 months ....but I m not sure BC will take time or not...someone advised me that also the possibility of PPR in less than a month...So lets keep our finger crossed
 
@ Al Soufi : thanks al soufi for your wishes
 
All the very best to all of you guys
 
Regards,
canadaboy
[/QUOTE]

-------------
Mooni


Posted By: treasury92
Date Posted: 06 Dec 2009 at 7:12am
Dear Chintu,
John has sent the document update in Aug 09.Kindly update as per ur convinience.
Thanks


Posted By: chintu
Date Posted: 06 Dec 2009 at 11:15am
TIMELINE SUMMARY     [John updated]

London CHC :


Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
samjul- London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Updt Sent May 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA), [Updt Req Apr 2009; Updt Sent Jul 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009, Updt Sent: Aug 2009]]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Reqt May 2009; Updt Sent July 2009, Addt Doc Req : Aug 2009, Addt Doc sent Oct 2009; Medical Req Nov 2009]
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 [Updt Req Oct 2009] (Q8)
Ashirale - London CHC - AOR Sep-2007 (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained




-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 06 Dec 2009 at 11:17am
Dear Treasury,

Thanks for the info. Have updated the timeline summary.

Chintu

Originally posted by treasury92 treasury92 wrote:

Dear Chintu,
John has sent the document update in Aug 09.Kindly update as per ur convinience.
Thanks


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: omaramir2
Date Posted: 06 Dec 2009 at 4:35pm
Dear Chintu,
Thank you for restarting again, let us hope it is a re start for our dream.Big smile
 
I was waiting for Med. like you & many other friends, but instead I received the following :
 
Dear Applicant:

In order to continue processing your application the following information is necessary:

-Proof that the post-secondary education that you received meets the definition of educational credential under R(73) which reads:

"educational credential" means any diploma, degree or trade or apprenticeship credential issued on the completion of a program of study or training at an educational or training institution recognized by the authorities responsible for registering, accrediting, supervising and regulating such institutions in the country of issue.

-Please also provide proof of the number of years you were in education, and provide proof that those years of education meets R(73). 

Please forward this information within 60 days from the date of this letter. If we do not hear from you within that period, your application will be assessed on the basis of the information on file and your application may be refused.Shocked

 

I have  2 certificates re-post secondary education

·         Two years Diploma from Egypt ( hotel & tourism ) which was attested.

·         Three years Diploma from India ( hotel Management ) which was not attested.

After receiving this letter I got the Indian certificate attested from india, my questions are:

1.       Is this what they are looking for ?

2.       Do I have to send the Original certificate ?

Please Help.

Regards,



-------------
With money you can buy a house,but not a home.You can buy a clock,but not time.You can buy a bed,but not sleep.You can buy a book,but not knowledge.You can buy blood, but not life.so say Elhamd lallah


Posted By: dardor
Date Posted: 06 Dec 2009 at 4:56pm
Originally posted by mowafaqb mowafaqb wrote:

they send me the update letter by email
 
wow
Dear Mowafaqb ,
congratulatioins , realy I feel so happy  for you and  hope  the next stage to be smooth and successful.
For me ,  I did the same and sent to CHC a query by email today and waiting for the reply .  I want to ask you about the due date for sending the updates . did they give you 4 months starting from the date of the email you recieved or from the date they sent you the letter on Oct 2009 ( whic you didn't recieve) . This is important to me because I have  similer case, my AOR is Aug2007 and I didn't recieve any thing from them yet . 
 
Regards
 
dardor 
 
 


Posted By: chintu
Date Posted: 07 Dec 2009 at 12:36am
Dear Omar,
 
In my opinion, your diploma certificates and transcrips in original need to be sent to London CHC. If you have a letter from the authorizing body stating that your institute is recognized under some educational act or is an approved organization, that would definitely help.
 
This step indicates that atleast there is some progress in your case. By the way, when did u recieve this letter?
 
Chintu
 
 
Originally posted by omaramir2 omaramir2 wrote:

Dear Chintu,
Thank you for restarting again, let us hope it is a re start for our dream.Big smile
 ................................
 After receiving this letter I got the Indian certificate attested from india, my questions are:

1.       Is this what they are looking for ?

2.       Do I have to send the Original certificate ?

Please Help.

Regards,



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: dardor
Date Posted: 07 Dec 2009 at 2:23am
Dear Chintu ,
I recieved today ( just few minutes ago) a letter of requesting documents updates from London CHC (through my POBox and not through email) .
It is dated 2 Nov 2009 ( my AOR was Aug 2007) .
Please update my entry in the timline .
Many thaks for your efforts .
 
Regards .
 
dardor
 


Posted By: omaramir2
Date Posted: 07 Dec 2009 at 2:48am
Dear Chintu,
 
Thank you for your reply, so you are advising me to send my original Indian Diploma certificate & a letter from the authorizing body stating that my institute is recognized under some educational act or is an approved organization. ok, but do I have to send the Egyptian certificate in original also ?
 
This letter was dated Oct.26 & I received it on Nov.10th
 
Regards,
 
Omar


-------------
With money you can buy a house,but not a home.You can buy a clock,but not time.You can buy a bed,but not sleep.You can buy a book,but not knowledge.You can buy blood, but not life.so say Elhamd lallah


Posted By: omaramir2
Date Posted: 07 Dec 2009 at 2:56am
Dear dardor,
Congratulation, did they give you 90 or 120 days ?
 
Regards,
Omar


-------------
With money you can buy a house,but not a home.You can buy a clock,but not time.You can buy a bed,but not sleep.You can buy a book,but not knowledge.You can buy blood, but not life.so say Elhamd lallah


Posted By: chintu
Date Posted: 07 Dec 2009 at 5:05am
Dear Omar,
 
I never mentioned INDIAN DIPLOMA.
 
If you are claiming points for your Egpytian Diploma then u surely need to send it. It is any way adviseable to send all educational documents to ensure that London CHC does not ask for them subsequently.
 
Chintu
Originally posted by omaramir2 omaramir2 wrote:

Dear Chintu,
 
Thank you for your reply, so you are advising me to send my original Indian Diploma certificate & a letter from the authorizing body stating that my institute is recognized under some educational act or is an approved organization. ok, but do I have to send the Egyptian certificate in original also ?
 
This letter was dated Oct.26 & I received it on Nov.10th
 
Regards,
 
Omar


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 07 Dec 2009 at 5:08am
TIMELINE SUMMARY     [Dardor updated]
 
London CHC :

Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
samjul- London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Updt Sent May 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA), [Updt Req Apr 2009; Updt Sent Jul 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009, Updt Sent: Aug 2009]]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Reqt May 2009; Updt Sent July 2009, Addt Doc Req : Aug 2009, Addt Doc sent Oct 2009; Medical Req Nov 2009]
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 [Updt Req Nov 2009] (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 [Updt Req Oct 2009] (Q8)
Ashirale - London CHC - AOR Sep-2007 (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained




-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 07 Dec 2009 at 5:19am
Congrats Dardor.
 
I have updated the timeline summary Tongue.
 
Chintu
 
Originally posted by dardor dardor wrote:

Dear Chintu ,
I recieved today ( just few minutes ago) a letter of requesting documents updates from London CHC (through my POBox and not through email) .
It is dated 2 Nov 2009 ( my AOR was Aug 2007) .
Please update my entry in the timline .
Many thaks for your efforts .
 
Regards .
 
dardor
 


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: ashirale
Date Posted: 07 Dec 2009 at 7:31am
Hi Chintu,
I got my Update Request dated October 26th, 2009 by email today. Kindly update and thank you for your co-ordination.

Dear Mowafaq,
Thanks alot for your very helpful post!

Ashirale


Posted By: dardor
Date Posted: 07 Dec 2009 at 9:21am
Originally posted by omaramir2 omaramir2 wrote:

Dear dardor,
Congratulation, did they give you 90 or 120 days ?
 
Regards,
Omar
 
Thanks alot dear Omar "omaramir2" for the congratulations , please accept the same from me .
My letter dated 2 Nov 2009 and they gave a period of time  until 2 March 2010 (this means 120 days )
 
the other interesting thig is that I recieved today also through email the same letter requesting the updates (as an answer to my query made two days ago to London CHC by email)- thanks moafaq -
 
I am preparing to send updates this month .
 
regards and best wishes to you and all friends
 
dardor  


Posted By: dardor
Date Posted: 07 Dec 2009 at 9:28am
Thank u very much dear chintu .
I wonder what could we do without your valuable  posts  dear? May Allah bless you.
  
Regards
dardor


Posted By: Batra
Date Posted: 07 Dec 2009 at 10:25am
Hi guys,
buddy Mowafaq, Dardor & Ashirale congrats for all of you.

it's really good news.
May God make it an introduction to a chain of good news to all of us

-------------
CHC LONDON, UPDATION LETTER 5/2009


Posted By: mehpk
Date Posted: 07 Dec 2009 at 10:35am
Dear chintu and all
 
My AOR is of NOV, 2007. Can any one have idea till when i would receive the update letter.
 
regards
 


Posted By: ashirale
Date Posted: 07 Dec 2009 at 11:57pm
Thanks Batra & congrats Dardor.

Mehpk....just a suggestion....try emailing them some time in January 2010 in case you dont hear from them by then.


Posted By: omaramir2
Date Posted: 08 Dec 2009 at 12:11am
Dear mehpk,
 
You should get it this month (Dec.) or next, I think ashirale's suggestion is a good one.
 
Regards


-------------
With money you can buy a house,but not a home.You can buy a clock,but not time.You can buy a bed,but not sleep.You can buy a book,but not knowledge.You can buy blood, but not life.so say Elhamd lallah


Posted By: omaramir2
Date Posted: 08 Dec 2009 at 12:35am
Dear chintu,
 
Thank you for your advise & inputs. I will do the needful.
 
Regards


-------------
With money you can buy a house,but not a home.You can buy a clock,but not time.You can buy a bed,but not sleep.You can buy a book,but not knowledge.You can buy blood, but not life.so say Elhamd lallah


Posted By: chintu
Date Posted: 08 Dec 2009 at 3:04am
TIMELINE SUMMARY     [Ashirale updated]
 
London CHC :

Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
samjul- London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Updt Sent May 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA), [Updt Req Apr 2009; Updt Sent Jul 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009, Updt Sent: Aug 2009]]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Reqt May 2009; Updt Sent July 2009, Addt Doc Req : Aug 2009, Addt Doc sent Oct 2009; Medical Req Nov 2009]
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 [Updt Req Nov 2009] (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 [Updt Req Oct 2009] (Q8)
Ashirale - London CHC - AOR Sep-2007 [Updt Req Nov 2009] (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 08 Dec 2009 at 3:05am
congrats Ashirale,
 
Start gathering all docs.
 
I have updated the timeline.
 
Chintu
 
Originally posted by ashirale ashirale wrote:

Hi Chintu,
I got my Update Request dated October 26th, 2009 by email today. Kindly update and thank you for your co-ordination.
Dear Mowafaq,
Thanks alot for your very helpful post!
Ashirale


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 08 Dec 2009 at 3:21am
Dear Dardor,
 
Thanks for the kind words and wishes. I think i really need lots of good wishes and blessings.
 
Chintu
 
Originally posted by dardor dardor wrote:

Thank u very much dear chintu .
I wonder what could we do without your valuable  posts  dear? May Allah bless you.
  
Regards
dardor


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: mowafaqb
Date Posted: 08 Dec 2009 at 3:56am
Congrats Dardor and Ashirale
it was a good step to send them an e mail
 
also thanx for chinto for this forum


Posted By: Sameer1979
Date Posted: 08 Dec 2009 at 10:01am
hey ya ,
 
          one more 2006 case dude , medicals done and waiting for PPR from london visa office , for more details at http://www.immigration.ca/forum/forum_posts.asp?TID=200&title=applicants-from-saudi-arabia-london-visa-office - http://www.immigration.ca/forum/forum_posts.asp?TID=200&title=applicants-from-saudi-arabia-london-visa-office  
 
keep up the good work
 
sameer


Posted By: sengeb
Date Posted: 12 Dec 2009 at 4:56am

Dear friends ,

 

I am very happy to see u all again here Big smile Tongue

Thank you Chintu for the revival of our valuable thread!

Congrats all my friends for ur updates & medical.Clap

I hope all  our cases will move soon Clap Clap



Posted By: chintu
Date Posted: 12 Dec 2009 at 11:06am
Dear Sengeb,

Any developments at ur end? Its been quite some time in ur case too.

Chintu

Originally posted by sengeb sengeb wrote:

Dear friends ,

 

I am very happy to see u all again here Big smile Tongue

Thank you Chintu for the revival of our valuable thread!

Congrats all my friends for ur updates & medical.Clap

I hope all  our cases will move soon Clap Clap



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: sengeb
Date Posted: 12 Dec 2009 at 3:43pm

Dear Chintu ,

As expected , so far nothing happened with my case till now !!Disapprove



Posted By: chintu
Date Posted: 20 Dec 2009 at 7:40am
Lets hope the new year will bring some good news for many of us.

Chintu

Originally posted by sengeb sengeb wrote:

Dear Chintu ,

As expected , so far nothing happened with my case till now !!Disapprove



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: dardor
Date Posted: 22 Dec 2009 at 4:20am
Hi ,
Any body kindly tell  me  how many copies of the forms (imm0008egen , imm0008_1e , imm0008_3e , and IMM5406E ) need to be filled and for whom ? I mean for principle applicant only or for the family members also .  
 
best wishes to all
 
Thanks and regards
 
dardor


Posted By: chintu
Date Posted: 22 Dec 2009 at 5:26am
Dear Dardor,
 
The application guide [Document IMM EG7000] clearly specifies which forms to be filled and for whom.
 
Chintu
 
 
Originally posted by dardor dardor wrote:

Hi ,
Any body kindly tell  me  how many copies of the forms (imm0008egen , imm0008_1e , imm0008_3e , and IMM5406E ) need to be filled and for whom ? I mean for principle applicant only or for the family members also .  
 
best wishes to all
 
Thanks and regards
 
dardor


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: dardor
Date Posted: 22 Dec 2009 at 10:27am
Dear Chintu , many thanks .
I got the guide .
 
Originally posted by chintu chintu wrote:

Dear Dardor,
 
The application guide [Document IMM EG7000] clearly specifies which forms to be filled and for whom.
 
Chintu
 
 
Originally posted by dardor dardor wrote:

Hi ,
Any body kindly tell  me  how many copies of the forms (imm0008egen , imm0008_1e , imm0008_3e , and IMM5406E ) need to be filled and for whom ? I mean for principle applicant only or for the family members also .  
 
best wishes to all
 
Thanks and regards
 
dardor


Posted By: ashirale
Date Posted: 22 Dec 2009 at 11:56pm
Hello all!
I have a question:
My current company has not been informed of my plans to immigrate.
I have the following documents:
Original 'Salary Certificate' (as it is called here in Kuwait)-this states all my job details includinh job title and salary but without job description.
Contract copy with Translation
Appointment letter copy
Original monthly Payslips

Can I also submit a self-written affidavit stating my job duties? Has anyone done something like this?
Kindly share your experience with regards to your current employer or previous employers who could not provide you with a letter containing your description. 
 


Posted By: can2k9
Date Posted: 23 Dec 2009 at 12:12am
how much time CIC take for BC for the guy who has worked in kuwait for 3 years??
Originally posted by chintu chintu wrote:

Lets hope the new year will bring some good news for many of us.Chintu
Originally posted by sengeb sengeb wrote:

Dear Chintu ,

As expected , so far nothing happened with my case till now !!Disapprove



Posted By: dardor
Date Posted: 24 Dec 2009 at 6:24am
Hi every body ,
When I submitted my application for simplified process (AOR Aug 2007) , I was 49 years old and this age gave me 10 points for age factor . Recently I have been requested to send my complete  and updated forms and documents .  I am 51 years old now (51 years given 6 points for age factor).
Tell me please how many points for age factor I have to count on 10 or 6 ?
 
best regards
 
dardor


Posted By: treasury92
Date Posted: 24 Dec 2009 at 4:27pm

Dear Chintu

John of Kuwait submitted the update to CIC on Aug 2009.Yesterday CIC sent him a letter to send PCC of UAE where he worked for few years.

With this you can note that Actions are taking place for the candidates who sent their updates in Aug 2009.

Thanks



Posted By: chintu
Date Posted: 25 Dec 2009 at 8:54am
Dear Treasury,

Thanks for hte update. John was requested for updates in Apr-2009. So if he is not from IT field or from the 38 occupations, it means London CHC is reaching applicants who were requested documents around Mar/Apr 2009.

By the way, if John were in UAE for few years, he should have sent his PCC as now the whole process of requesting and getting a UAE PCC may delay his case by 3-4 months.

Regards,
Chintu

Originally posted by treasury92 treasury92 wrote:



Dear Chintu

John of Kuwait submitted the update to CIC on Aug 2009.Yesterday CIC sent him a letter to send PCC of UAE where he worked for few years.

With this you can note that Actions are taking place for the candidates who sent their updates in Aug 2009.

Thanks



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: ashirale
Date Posted: 25 Dec 2009 at 10:27am
hi dardor, you will get 10 points. Age is locked in on the date that you signed your initial SAP application.
However, if you had an unmarried  dependant who was 21 years or under on the lock-in date, the dependant should not have married before issuance of PPR. 


Posted By: dardor
Date Posted: 25 Dec 2009 at 2:48pm
Thank u very much dear ,
thats  great , good news , I was afraid of loosing those 4 points.
regards
 
 
Originally posted by ashirale ashirale wrote:

hi dardor, you will get 10 points. Age is locked in on the date that you signed your initial SAP application.
However, if you had an unmarried  dependant who was 21 years or under on the lock-in date, the dependant should not have married before issuance of PPR. 


Posted By: treasury92
Date Posted: 26 Dec 2009 at 4:18am

Dear Chintu

John tried to get PCC of UAE at initial stage but UAE embassy in Kuwait did not agreed to give PCC as they wanted official request from CIC.
John works for ISO certification company. I Dont know whether its on 38 Occupational list.
Apart from UAE PCC, CIC also asked him to furnish more details about his brother who is citizen in canada.
Regards


Posted By: chintu
Date Posted: 27 Dec 2009 at 5:51am

Dear Treasury,

Thanks for the info. Wishing John the very best for further processing.

Chintu



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: mowafaqb
Date Posted: 29 Dec 2009 at 3:02am
hi all
 
one of my friends just got the medical , his time line as the following
 
apllication          11/2006
file num              2/2007
update            11/2008
doc sent           2/2009
medica requ   12/2009
 
from kuwait
his name is Aws
 
good news for who is waiting for medical


Posted By: chintu
Date Posted: 29 Dec 2009 at 3:43am
TIMELINE SUMMARY     [AWS Added]
 
London CHC :

Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc
Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
AWS - London CHC - AOR Feb-2007 (Q8) [Updt Req Nov, 2008; Doc Sent Feb, 2009; Med Req Dec, 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
samjul- London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Updt Sent May 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA), [Updt Req Apr 2009; Updt Sent Jul 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009, Updt Sent: Aug 2009]]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Reqt May 2009; Updt Sent July 2009, Addt Doc Req : Aug 2009, Addt Doc sent Oct 2009; Medical Req Nov 2009]
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 [Updt Req Nov 2009] (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 [Updt Req Oct 2009] (Q8)
Ashirale - London CHC - AOR Sep-2007 [Updt Req Nov 2009] (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 29 Dec 2009 at 3:46am
Thanks Mowafaqb,
 
This is good news. I have added the case to our timeline summary.
 
Chintu
 
Originally posted by mowafaqb mowafaqb wrote:

hi all
 
one of my friends just got the medical , his time line as the following
 
apllication          11/2006
file num              2/2007
update            11/2008
doc sent           2/2009
medica requ   12/2009
 
from kuwait
his name is Aws
 
good news for who is waiting for medical


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: MarsLander
Date Posted: 29 Dec 2009 at 9:38am
Hi All:
Thanks for maintaining this thread,
It seems my time line is longer than most of the list, I'm residing in Abu Dhabi
 
Timeline - London Office

AOR------------------------- 06-October-2005

90 Days update Letter----  15-Feb-2008

Update Sent----------------- 10-May-2008

Medical----------------------- 22-Oct-2009

Medical Sent-------------------01-Dec-2009
 
Waiting for the Visa requst
 
Thanks & Regards


Posted By: mowafaqb
Date Posted: 30 Dec 2009 at 3:49am
oh my god!!!
 
17 months to get the medical? what is your occupation , qualifications


Posted By: can2k9
Date Posted: 30 Dec 2009 at 4:12am
why there is no PPR with medicals for u guys??

Originally posted by mowafaqb mowafaqb wrote:

hi all
 

one of my friends just got the medical , his time line as the following

 

apllication          11/2006

file num              2/2007

update            11/2008

doc sent           2/2009

medica requ   12/2009

 

from kuwait

his name is Aws

 

good news for who is waiting for medical


Posted By: MarsLander
Date Posted: 30 Dec 2009 at 8:56am
Hello Mowafab,
 
I am in IT , System Administrator,
I think the Background checking takes time, if you travel to many countries and for some nationalities it takes longer time,
 
I hope the passport request for the visa will not take that much time, they said it is around 4 month or at least 2 months for the visa request


Posted By: mod
Date Posted: 31 Dec 2009 at 12:59am
Happy New Sun Year


Posted By: MOON
Date Posted: 31 Dec 2009 at 6:58am
Happy New Year to All

-------------
Mooni


Posted By: chintu
Date Posted: 31 Dec 2009 at 1:16pm
Wishing every one a HAPPY NEW YEAR 2010. The year 2010 will bring good news for lots of us and will take many of us to Canada.

Chintu


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: mehpk
Date Posted: 01 Jan 2010 at 4:26pm
Dear chintu
 
how the poits for IELTS are caculated?
 
I got overall 6.5 and then L=6.5, S=6.5, R=6.5 and W=6
 
happy new year to all
 
cheers
 


Posted By: chintu
Date Posted: 02 Jan 2010 at 2:16am
As per old rules, its 2+2+2+2 = 8 points
As per new rules, its 2+4+4+2 = 12 points

Chintu

Originally posted by mehpk mehpk wrote:

Dear chintu
how the poits for IELTS are caculated?
I got overall 6.5 and then L=6.5, S=6.5, R=6.5 and W=6
Happy new year to all
cheers


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: saseme05
Date Posted: 02 Jan 2010 at 5:21pm
"Happy New Year to all of the fellows"
@Chintu... Dear chintu, I am feeling myself very silly b/c from the last one month I was thinking that this forum has been ended now, b/c the previous forum was showing that this forum is locked, but today I found this new link & I am so happy to see this forum in a new look again & I am happy to those fellows too who have got their Update or medical request.
 
@Nina... you will require to show your original passport at the time of your medical appointment b/c I gave my medical exam at the DMP in UK & he took our passport with the forms then returned them at the end of the test.
 
Regards..


Posted By: nina.roy
Date Posted: 02 Jan 2010 at 9:11pm
Thanks for sharing that sesame05 :-) Good Luck...

-------------
There is always light at the end of the tunnel


Posted By: sarachris
Date Posted: 03 Jan 2010 at 5:59am
congratulations mowafaqb

-------------
http://immig-canada.blogspot.com - Canada Immigration Guide


Posted By: mowafaqb
Date Posted: 04 Jan 2010 at 4:18am
thank u sarachris
 
what is ur time line ?


Posted By: mowafaqb
Date Posted: 04 Jan 2010 at 4:22am
i think they will not caculate the new IELTS (after Nov 2008) on the old rating
but
 
they will calculate the old IELTS (before 11/2008) on the old or new system and taking the best


Posted By: ashirale
Date Posted: 05 Jan 2010 at 11:28am
Hi Chintu!
I just sent my documents this evening to CHC London.
Aramex said that it would take 3 working days. Kindly update the list. (Update Sent Jan 2010) 
Thanks for your support.Smile
 
Hello all! May 2010 bring an abundance of poutine, ice hockey, maple syrup toffees, permanent residence visas, sugar, spice and everything nice that is Canadian!Oh...did I mention permanent residence visas?? Big smile
How aboot that, eh? Happy New Year and good luck to all my fellow visa waiters! 
Have  great 2010!!LOL


Posted By: samjul1975
Date Posted: 06 Jan 2010 at 3:03am
Hi to all,
 
I wish everyone a happy new year 2010.
Whatever wishes you have let it will happen in 2010.
 
CHC issued Medical request with Forms on Dec 1st, received same on 27th
i need to complete medicals in 60 days time ie, before Feb 1st 2010. This sunday 10th i have an appointment with DMP also need to send RPRF demand draft.
Chintu kindly update my timeline.
i pray that CHC will start issuing more Medicals this month and comming months for AOR 2007 Applicants.
 
Regards
samjul
 
 
 
 
 


Posted By: chintu
Date Posted: 06 Jan 2010 at 4:08am
TIMELINE SUMMARY     [Samjul + Ashirale Updated]
 
London CHC :

Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc
Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
AWS - London CHC - AOR Feb-2007 (Q8) [Updt Req Nov, 2008; Doc Sent Feb, 2009; Med Req Dec, 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
Samjul - London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Doc Sent May 2009, Med Req Dec 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA), [Updt Req Apr 2009; Updt Sent Jul 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009, Updt Sent: Aug 2009]]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Reqt May 2009; Updt Sent July 2009, Addt Doc Req : Aug 2009, Addt Doc sent Oct 2009; Medical Req Nov 2009]
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 [Updt Req Nov 2009] (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 [Updt Req Oct 2009] (Q8)
Ashirale - London CHC - AOR Sep-2007 [Updt Req Nov 2009, Doc Sent Jan 2010] (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained




-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 06 Jan 2010 at 4:09am
Hi Samjul,
 
Congrats. Thats good news. I have updated the timeline.
 
I too hope year 2010 brings good times for all of us.
 
Chintu
 
Originally posted by samjul1975 samjul1975 wrote:

Hi to all,
 
I wish everyone a happy new year 2010.
Whatever wishes you have let it will happen in 2010.
 
CHC issued Medical request with Forms on Dec 1st, received same on 27th
i need to complete medicals in 60 days time ie, before Feb 1st 2010. This sunday 10th i have an appointment with DMP also need to send RPRF demand draft.
Chintu kindly update my timeline.
i pray that CHC will start issuing more Medicals this month and comming months for AOR 2007 Applicants.
 
Regards
samjul
 
 


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 06 Jan 2010 at 4:10am
Dear Ashirale,
 
I have updated the timeline summary.
 
Thanks and regards,
Chintu
 
Originally posted by ashirale ashirale wrote:

Hi Chintu!
I just sent my documents this evening to CHC London.
Aramex said that it would take 3 working days. Kindly update the list. (Update Sent Jan 2010) 
Thanks for your support.Smile
 
Hello all! May 2010 bring an abundance of poutine, ice hockey, maple syrup toffees, permanent residence visas, sugar, spice and everything nice that is Canadian!Oh...did I mention permanent residence visas?? Big smile
How aboot that, eh? Happy New Year and good luck to all my fellow visa waiters! 
Have  great 2010!!LOL


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 11 Jan 2010 at 1:31pm
TIMELINE SUMMARY     [Simplyanas Updated]
 
London CHC :

Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc
Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
AWS - London CHC - AOR Feb-2007 (Q8) [Updt Req Nov, 2008; Doc Sent Feb, 2009; Med Req Dec, 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
Samjul - London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Doc Sent May 2009, Med Req Dec 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA) [Updt Req Apr 2009; Docs sent Jul 2009; Med Req Dec 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009, Updt Sent: Aug 2009]]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Reqt May 2009; Updt Sent July 2009, Addt Doc Req : Aug 2009, Addt Doc sent Oct 2009; Medical Req Nov 2009]
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 [Updt Req Nov 2009] (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 [Updt Req Oct 2009] (Q8)
Ashirale - London CHC - AOR Sep-2007 [Updt Req Nov 2009, Doc Sent Jan 2010] (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: canadaboy
Date Posted: 17 Jan 2010 at 3:10pm
Hello Guys,
 
Just need to update you that I received my PPR last week and already sent my passports for visa stamping. Waiting for PP now back. Finally long waiting period looks like over now. Chintu pls update my timeline.
 
All the best to all of you who are waiting for medical and PPR.
 
Best regards,
cboy


Posted By: chintu
Date Posted: 17 Jan 2010 at 11:22pm
TIMELINE SUMMARY     [Canadaboy Updated]
 
London CHC :

Shaji - London CHC - AOR Jan-2007 (KSA)
alysayeed - London CHC - AOR Jan-2007 (KSA) [Updt Req Nov 12, 2008; Updt Sent Feb 2009, IELTS sent June 2009]
coll2can - London CHC - AOR Feb-2007 (Ireland) [Updt Reqt Nov 2008; Updt Sent Jan 2009, Addt Doc
Req : Feb 2009, Addt Doc Sent: Mar 2009, Med Req:Sep 2009, PPR:Nov 2009]
AWS - London CHC - AOR Feb-2007 (Q8) [Updt Req Nov, 2008; Doc Sent Feb, 2009; Med Req Dec, 2009]
Chohan - London CHC - AOR Mar-2007 (UK)
Indian-Oman-Kuwait - London CHC - AOR Mar-2007 [Updt Req Feb 2009, Upt sent May 2009, Med Req Jun 2009, Med Sent Jul 2009, PCC sent Sep 2009; PPR: Sep 2009; Visa Stamped: Oct 2009]
Ans333 - London CHC - AOR Mar-2007 (UK), [Updt Req Feb 06, 2009]
Omaramir - London CHC - AOR Apr-2007 (UAE) [Updt Req Feb 2009, Updt sent May 2009]
Obir2007 - London CHC - AOR May-2007 (UK) [Updt Req Feb 26, 2009; Doc Sent May 2009; Med Req Sep 2009]
Aqsaa - London CHC - AOR May-2007 (UAE)[Updt Req Feb 2009, Updt Sent May 2009]
Samjul - London CHC - AOR May-2007 (UAE) [Updt Req Feb 2009, Doc Sent May 2009, Med Req Dec 2009]
Ashraf - London CHC - AOR May-2007 (Q8)[Updt Req Mar 2009, Updt Sent Jul 2009]
Sengeb - London CHC - AOR May-2007 (Q8) [Updt Req:Feb 25, 2009; Updt Sent:Apr 2009]

Kavitha - London CHC - AOR May-2007
Goodpikey - London CHC - AOR May-2007 (Ireland)[Conf letter in Aug-08]

Mjehanzeb - London CHC - AOR Jun-2007 [Updt Req Apr 2009, Updt sent Jun 2009, Med Req July 2009, Med Sent Aug 2009, PPR Aug 2009; Visa Stmpd Sep-2009]
Tamer - London CHC - AOR May-2007 [Updt Req Apr.2009, Doc Sent Jul 2009] (UAE)
Simplyanas - London CHC - AOR Jun-2007 (KSA) [Updt Req Apr 2009; Docs sent Jul 2009; Med Req Dec 2009]
Batra - London CHC - AOR Jun-2007 (KSA)[Conf letter in Aug-08][Updt Req May 4, 2009, Updt Sent May 2009]

JP1981 - London CHC - AOR Jun-2007 (UK) [Updt Req Mar 2009]
Mousally - London CHC - AOR Jun-2007 (Iraq)[Updt Req Apr 2009]
J-Ireland - London CHC - AOR Jun-2007 (Ireland) [Updt Req Mar, 2009]
Saseme05 - London CHC - AOR June-2007 [Updt Req Apr.2009, Doc Sent Aug 2009,IELTS sent Sep 2009, Med reqt + done Oct 2009) (UK).
Jamesinderby - London CHC - AOR Jun-2007 (UK)[Conf letter in Sep-08][Updt Req Apr, 2009]

Cks - London CHC - AOR June 2007 (KSA) [Updt Req Jul 2009]

John - London CHC - AOR Jul-2007 (Q8) [Updt Reqt Apr 2009, Updt Sent: Aug 2009]]
Canadaboy - London CHC - AOR Jul-2007 (KSA) [Updt Rqt May 2009; Updt Sent Jul 2009, Add. Doc Req Aug 2009, Add Doc Sent Oct 2009, Med Req Nov 2009, PPR Jan 2010]Smile
Chintu - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08][Updt Reqt: May 2009, Updt sent: Jun 2009]
Singh.sid - London CHC - AOR Jul-2007 (UK) [Updt Reqt May 2009]

Mystic - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Aug 2009] (Oman)
Al-Soufi - London CHC - AOR Jul-2007 [Updt Req June 2009, Doc Sent Oct 2009] (KSA)
Lovinguy - London CHC - AOR Jul-2007 (Bah)[Conf letter in Sep-08, Updt Req:Aug-2009]
Lianne - London CHC - AOR Jul-2007 (UAE)[Updt Reqt June 2009]
QMT - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08][Updt Req Jul-2009, Updt Sent Sep-2009]

Treasury92 - London CHC - AOR Jul-2007 (Q8)[Conf letter in Sep-08] ; Updt Reqt Jul 2009; Doc Sent Nov 2009]
Ashaikh - London CHC - AOR Jul-2007 (KSA)[Conf letter in Sep-08]
Nouman - London CHC - AOR Jul-2007 [Updt Req Jul 2009,] (Q8)
Nina.Roy - London CHC - AOR Jul-2007 [Updt Req Jul 2009,Updt Sent Oct-2009] (UK)



Amnnma - London CHC - AOR Aug-2007
Dardor - London CHC - AOR Aug-2007 [Updt Req Nov 2009] (Oman)
Nadeem - London CHC - AOR Sep-2007 (Bah)
Cellocute - London CHC - AOR Sep-2007
Mowafaq - London CHC - AOR Sep-2007 [Updt Req Oct 2009] (Q8)
Ashirale - London CHC - AOR Sep-2007 [Updt Req Nov 2009, Doc Sent Jan 2010] (Q8)
Moosey - London CHC - AOR Sep-2007 (UK)
Nasa - London CHC - AOR Oct-2007 (KSA)[Conf letter in Sep-08]
whatzmyname - London CHC - AOR Nov-2007

mehpk - London CHC - AOR Nov-2007 (Bahrain)[Conf letter in Aug-08]
Singh - London CHC - AOR Nov-2007 (Q8)[Conf letter in Sep-08]
Mountain55 - London CHC - AOR Nov-2007 (UK)[Conf letter in Oct-08]
Jamshaid - London CHC - AOR Jan-2008
Vora - London CHC - AOR Feb-2008 [Conf letter in Aug-08]

Nasirpk - London CHC - AOR Feb-2008 (UK)
Hronaque - London CHC - AOR Feb-2008 (Q8)

ITGuy - London CHC - AOR Feb-2008 [Updt sent Apr-09, IELTS Reqt in Apr-2009]
Hespi - London CHC - Applied Apr-2008 (UAE)


Other CHC :


Shaff - Kingston CHC - AOR Mar-2007 / Update in Apr-2008
Aqeelmemon - Pakistan CHC - AOR Jan-2007 [Conf letter in May-09]
MaratS - Moscow CHC - AOR Apr-2007
Longwait - Nairobi CHC - AOR May-2007 [Conf letter in Oct-08]
Pgirish21 - Delhi CHC - AOR June-2007 [Conf letter in Oct-08]
Muraejb - Delhi CHC - AOR Aug-2007
Kien - Ankara CHC - AOR Sep-2007 [Updt Req Mar 2009]
YeahYeah - Kingston CHC - AOR Jun-2007 / Update in Nov/Dec-2008
Ngagamy - Cairo CHC - AOR Oct-2007 [Conf letter in Oct-08]
Dharmesh - Delhi CHC - AOR Nov-2007 [Conf letter in Aug-08]
Kidrock - Delhi CHC - AOR Jan-2008 [Conf letter in Sep-08]


lasimo - Rome CHC - AOR May 2007 / Updt:Mar 2008 / Meds:Jul 2008 / PPR, PR:Sep 2008


Color Coding :
Red : AOR Awaited 
purple : AOR Recvd
Blue : Updates
Orange : Medicals / Interview 
Turquoish : PPR
Green : PR visa obtained



-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 17 Jan 2010 at 11:23pm
Hi Cboy,
 
Congrats on getting your PPR. Thats great news. I have updated the timeline summary.
 
Chintu
 
Originally posted by canadaboy canadaboy wrote:

Hello Guys,
 
Just need to update you that I received my PPR last week and already sent my passports for visa stamping. Waiting for PP now back. Finally long waiting period looks like over now. Chintu pls update my timeline.
 
All the best to all of you who are waiting for medical and PPR.
 
Best regards,
cboy


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: ashirale
Date Posted: 18 Jan 2010 at 12:16am
Congrats Canadaboy! Thumbs Up 


Posted By: Al_Soufi
Date Posted: 18 Jan 2010 at 4:56am
Originally posted by canadaboy canadaboy wrote:

Hello Guys,
 
Just need to update you that I received my PPR last week and already sent my passports for visa stamping. Waiting for PP now back. Finally long waiting period looks like over now. Chintu pls update my timeline.
 
All the best to all of you who are waiting for medical and PPR.
 
Best regards,
cboy
 
 
Mabrook
 
Wish you all the best inshaallah.


Posted By: canadaboy
Date Posted: 18 Jan 2010 at 9:41am
Thanks Chintu , Ahsrile and alSoufi  .............All the best to all of you for fast processing .
 
Regards,
Cboy


Posted By: yeahyeah
Date Posted: 18 Jan 2010 at 1:31pm
Hi guys

Just checking in on you. I still have not received medical requests yet and so I am still waiting.

I hope this year brings good news for us all.

Congrats to Canadaboy and everyone else that have moved one step closer to their dreams


Posted By: MOON
Date Posted: 19 Jan 2010 at 4:27am
Dea Candaboy,
What about your original documents how they did sedn back to you?
 
Moon
 


-------------
Mooni


Posted By: chintu
Date Posted: 19 Jan 2010 at 5:45am
Dear Yeahyeah,
 
Could you please share your timeline.
 
Thanks and regards,
Chintu
 
Originally posted by yeahyeah yeahyeah wrote:

Hi guys

Just checking in on you. I still have not received medical requests yet and so I am still waiting.

I hope this year brings good news for us all.

Congrats to Canadaboy and everyone else that have moved one step closer to their dreams


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: canadaboy
Date Posted: 19 Jan 2010 at 6:05am
Hello Moon,
 
They said that they have sent by registered mail and I have not yet received but I m expecting to receive this week. We have postal system is very slow in saudia so I m expecting to receive anytime. I checked with Postal office and they said they have not received yet.
 
So lets hope I will get it soon.
 
Thanks
Cboy


Posted By: yeahyeah
Date Posted: 19 Jan 2010 at 1:18pm
Good day all

Chintu you have my timeline in your summery. I applied through the Kingston, Jamaica office.

For quick reference:

I applied June 07
Doc Request: November 08
Doc Submitted: December 08
Awaiting Med request.

It seems that the 2007 cases have been shelved as no one at the Kingston office is really seeing any movement on their case. The persons from the list of 38 are getting responses but I am sure that things will start moving for us soon.

So many plans put on hold... I pray they work fast as most of us would love to land this year

-------------
Applied: June 07
<br />Doc Req: November 08
<br />Doc submitted: December 08
<br />Submitted updated Doc: March 10
<br />Awaiting Med Request....


Posted By: Mustafa
Date Posted: 20 Jan 2010 at 12:05am
we are applied early 2007 . AOR in March 2007, update sent April 2009 . medical not received yet . E.status  in process. my question is there   any possibility for refusal ? and how much medical take normally 


Posted By: chintu
Date Posted: 20 Jan 2010 at 1:01am
Hi Yeahyeah,
 
I just noticed ur details in the summary. sorry missed it earlier.
 
Even london CHC seems to be slow with 2007 applicants. Hope things start moving for most of us.
 
Chihntu
 
Originally posted by yeahyeah yeahyeah wrote:

Good day all

Chintu you have my timeline in your summery. I applied through the Kingston, Jamaica office.

For quick reference:

I applied June 07
Doc Request: November 08
Doc Submitted: December 08
Awaiting Med request.

It seems that the 2007 cases have been shelved as no one at the Kingston office is really seeing any movement on their case. The persons from the list of 38 are getting responses but I am sure that things will start moving for us soon.

So many plans put on hold... I pray they work fast as most of us would love to land this year


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: chintu
Date Posted: 20 Jan 2010 at 1:03am
Dear Mustafa,
 
Timing of medicals is quite unpredictable. It seems CHC is following some set guidelines based on which priority of processing is decided for 2007 applicants. It may be worth writing to them [email] as its > 9 months since u sent ur documents.
 
Chintu


-------------
@ CHC London.
AOR-Jul 2007; Updt Req-May 2009; Updt Sent-Jun 2009; Med + Add Doc Req-Aug 2010; Med + Doc Sent-Oct 2010; PPR-Apr 2011; Visa Recvd-Jun 2011; Landed Aug 2011


Posted By: Mustafa
Date Posted: 20 Jan 2010 at 1:20am
Dear Chintu

You mean that i should email them about my case



Print Page | Close Window