Just wanted to keep the Nairobi forum going. Hope you find this new thread.
Elmo Edited by ermikyimer - 30 Nov 2009 at 11:15pm |
|
ermikyimer
New Member Joined: 30 Nov 2009 Location: ET Status: Offline Points: 29 |
Post Options
Thanks(0)
|
Hey Moja,
Could you please move the nairobi timelines from pg 11 to this forum? Thx! |
|
ourkid8
New Member Joined: 01 Dec 2009 Location: Richmond Hill Status: Offline Points: 34 |
Post Options
Thanks(0)
|
test
Edited by ourkid8 - 02 Dec 2009 at 11:32pm |
|
Moja
Junior Member Joined: 02 Dec 2009 Location: Alberta, Canada Status: Offline Points: 66 |
Post Options
Thanks(0)
|
Hi guys. Thanks Ourkid.
|
|
ourkid8
New Member Joined: 01 Dec 2009 Location: Richmond Hill Status: Offline Points: 34 |
Post Options
Thanks(0)
|
Quick question everyone... How much did everyone pay for their spouses PR application? I just found out Nairobi is waiting for the Right to permanent residence fee ($490) and my MP's office will find out what payments they have and what is missing as I am pretty sure I paid for that... My bring forward date is January 7, 2010... YAY, it is almost here! A little over 1 month to go! :) :) :)Thanks,
Shahed Edited by ourkid8 - 02 Dec 2009 at 2:19pm |
|
Sarum
New Member Joined: 02 Dec 2009 Status: Offline Points: 45 |
Post Options
Thanks(0)
|
Hi Ourkid,
I paid 1040 in total included the $490 RPRF Glad to hear thins are moving along for you Edited by Sarum - 02 Dec 2009 at 4:37pm |
|
abyssinian
New Member Joined: 02 Dec 2009 Location: A.A Status: Offline Points: 9 |
Post Options
Thanks(0)
|
Hey!? new forum!?
|
|
gakians
New Member Joined: 30 Nov 2009 Status: Offline Points: 48 |
Post Options
Thanks(0)
|
Hey the PR application is $1040.00 But you can decide to pay first $550.00 then pay the Right of PR fees mid way as they process; but its recommended not to wait until they ask for it!!
As for me; i paid the first 550.00 in mississauga then attemps to pay the 490.00 in Nairobi was rejected and they advised me to pay it in CPC-MISS., which I did in August 2009. ---- I am also wondering; how long does it take to get an answer from Nairobi; through an MPs office?? Please answer me; Thanks |
|
ourkid8
New Member Joined: 01 Dec 2009 Location: Richmond Hill Status: Offline Points: 34 |
Post Options
Thanks(0)
|
Ian - My MP's office responded back to me the next day...
Phew... I actually did pay $1040.00... Now it's time to sort out this little mess that I did not pay my wife's Right to permanent residence fee. Dealing with Immigration Canada is THE MOST frustrating process ever! Shahed Edited by ourkid8 - 02 Dec 2009 at 11:34pm |
|
Moja
Junior Member Joined: 02 Dec 2009 Location: Alberta, Canada Status: Offline Points: 66 |
Post Options
Thanks(0)
|
NAIROBI KENYA PR APPLICATION OUTLAND TIMELINES Estimated 29 Months processing time Female
**(PR application approved and landed)** VINEZY ~ Application mailed to CPC-MISS Aug 5, 2005
~ Sponsorship approved Aug 29, 2005 ~ Nairobi Kenya Started processing PR application Sept 19, 2005 ~ Interview was scheduled in early Nov 2005, It was later canceled ~ PR application was approved Dec 21, 2005 ~ Received visa, traveled to Canada Jan 23, 2006 AVUBWANA ~ Sponsorship approved Sept 8, 2006 ~ Nairobi Kenya received PR application Sept 19, 2006 ~ Nairobi Kenya Started processing PR application Oct 17, 2006 ~ Request for additional information May 2007 ~ Interview is being scheduled as of Jul 2007 ~ Interview is scheduled in the beginning of Oct 2007 ~ Approved @ interview Oct 2007 ~ Received PP with visa Oct 17, 2007 ~ Landed Oct 26, 2007 LOMBE ~ Application mailed to CPC-MISS Au 12, 2006 ~ Application received by CPC-MISS Aug 15, 2006 ~ Sponsorship approved Sept 26, 2006 ~ Nairobi Kenya Started processing PR application Nov 3, 2006 ~ Request for additional information May 18, 2007 ~ PPR dated Mar 10, 2008, Received PPR on Mar 19, 2008 ~ Request to redo Medicals/Police Clearance ~ Sent Passport/Police clearance May 16, 2008 ~ Received Visa Jul 15, 2008 ~ Landed Jul 28, 2008 MANDAMUS ~ Application received by CPC-MISS Aug 15, 2006 ~ Sponsorship approved Sept 29, 2006 ~ Nairobi Kenya received PR application Oct 12, 2006 ~ Nairobi Kenya Started processing PR application Nov 20, 2006 ~ Received AOR letter Dec 4, 2006 ~ Got MP to make an inquiry Mar 21, 2007 ~ MP said no progress on PR application Mar 30, 2007 ~ PPR dated Apr 24, 2007, Received PPR on May 7, 2007 ~ Received PP with visa May 18, 2007 ~ Landed May 28, 2007 ~ Was given until June,10 to Land MOJA ~ Application received by CPC-MISS Sept 11, 2006 ~ Sponsorship approved Oct 16, 2006 ~ Nairobi Kenya received PR application Oct 23, 2006 ~ Nairobi Kenya Started processing PR application Nov 30, 2006 ~ Received AOR letter Dec (mid month) 2006 ~ Got MP to make an inquiry Mar 26, 2007 ~ MP said medicals were never received, first review not done Mar 30, 2006 ~ Medicals re-done Apr 10, 2007 ~ Mailed the request for CAIPS notes Apr 19, 2007 ~ MP confirmed Medicals & RCMP Clearance have been received May 17, 2007 ~ PPR dated May 12, 2007, Received PPR May 19, 2007 ~ Received CAIPS notes Jun 4, 2007 ~ Decision Made June 11, 2007 ~ Received PP with visa Jun 28, 2007 ~ Landed Jul 17, 2007 ~ Was given until Apr 2008 to Land JAIME ~ Application received by CPC-MISS Sept 26, 2006 ~ Sponsorship approved Oct 30, 2006 ~ Nairobi, Kenya started processing PR application Jan 16, 2007 (never received AOR) ~ PPR and request for chest x-rays dated June 12, 2007 Received PPR June 21, 2007 ~ X-rays and PP sent June 25, 2007 ~ Mailed the request for CAIPS notes July 3, 2007 ~ Decision Made July 30, 2007 (e-cas updated) ~ Letter received, Aug 7, 2007 indicating PP ready to be picked up ~ Received Visa Aug 8, 2007 ~ still waiting for CAIPS ~ Landed Aug 26, 2007 GREAT_GU ~ Application received by CPC-MISS Oct 31, 2006 ~ CPC-MISS started processing sponsorship application Nov 30, 2006 ~ Sponsorship approved Dec 11, 2006 ~ Nairobi Kenya Started processing PR application Feb 14, 2007 ~ Received AOR letter Mar (month end) 2007 ~ PPR dated May.3 2007, Received PPR May 16, 2007 ~ Received a letter requesting Police Clearance From Tanzania Jun 13, 2007 ~ Received a letter requesting to re-do X-RAY Aug 27, 2007 ~ Decision Made on E-CAS Oct 8, 2007 ~ Received PP with visa Oct 9, 2007 ~ Landed Nov 16, 2007 NORRINRADD ~ Application mailed to CPC-MISS Nov 14, 2006 ~ Sponsorship approved Dec 20, 2006 ~ Received AOR Dec 9, 2006 ~ Nairobi Kenya Started processing PR application Jan 26, 2007 ~ Request to pay Right Of Permanent Residence Fee Apr 27, 2007 ~ PPR Jun 5, 2007 ~ Decision made Jun 25, 2007 ~ PP picked up from Embassy Jul 3, 2007 ~ Landed Jul 11, 2007 ~ Was given until Oct 13, 2007 to Land SUKY ~ Application received by CPC-MISS Dec 6, 2006 ~ Sponsorship approved Jan 13, 2007 ~ Nairobi Kenya Started processing PR application Mar 28, 2007 ~ Interview Sep 18, 2007 ~ Medicals re-done, police clearance TZ/UK and PP sent Feb 10, 2008 ~ Received Visa Jun 27, 2008 ~ Landed Jul 3, 2008 YOGIBEAR ~ Application received by CPC-MISS Jan 31, 2007 ~ Sponsorship approved Feb 26, 2007 ~ Nairobi Kenya Started processing PR application Jul 31, 2007 ~ MP said that interview is being scheduled Dec 17, 2007 ~ MP said that interview was to be in Mar 2008 (no date set) ~ PPR dated Dec 15, 2008 ~ Received PP with visa Jan 22, 2009 ~ Landed Feb 9, 2009 MADEM ~ CPC-MISS started processing sponsorship application Mar 14, 2007 ~ Sponsorship approved Apr 3, 2007 ~ Nairobi Kenya received PR application Apr 2007 ~ Nairobi Kenya Started processing PR application Jul 31, 2007 ~ Interview is being scheduled as of Jul 2007 ~ Interview April 7, 2008 ~ PPR @ Interview Apr 7, 2008 ~ Request to redo Med/Police Apr 7, 2008 ~ Received Visa Jun 23, 2008 ~ Landed Jun 26, 2008 SPRUNGER ~ Application received by CPC-MISS Apr 3, 2007 ~ Sponsorship approved May 1, 2007 ~ Nairobi Kenya Started processing PR application May 10, 2007 ~ Received AOR letter Jun 11, 2007 ~ Request to pay right of permanent residence fee Sept 21, 2007 ~ PPR Sept 21, 2007 ~ Received PP with visa Oct 2, 2007 ~ Landed Oct 5, 2007 OMAR ~ Application received by CPC-MISS Apr 17, 2007 ~ Sponsorship approved Apr 20, 2007 ~ Nairobi Kenya received PR application May 17, 2007 ~ Nairobi Kenya Started processing PR application May 20, 2007 ~ Received AOR letter Jun 27, 2007 ~ PPR dated Aug 20, 2007 ~ Received PP with visa Sept 10, 2007 ~ Landed Oct 1, 2007 ABYSSINIAN ~ PPR dated Dec 14, 2009 Received Dec 25, 2009 ~ PP picked up from Embassy Jan 25, 2010 SAMY ~ Request for PP Pictures & PPR dated Nov 18, 2009 Received PPR Dec 9, 2009 ~ PP picked up from Embassy Jan 26, 2010 OURKID ~ PPR Dec 18, 2009 ~ PP picked up from Embassy Feb 8, 2010 HARIR ~ PP picked up from Embassy Feb 4, 2010
GAKIANS 1 Year 4 Months
~ Application received by CPC-MISS Jan 15, 2009 ~ Request to Re-Do Medicals and to send in PP one month from Jan 11, 2010
~ Received Visa May 19, 2010, Visa issued Apr 14, 2010.
~ Landed Jun 5, 2010 ERMIKYIMER 1 Year 3 Months ~ Application mailed to CPC-MISS Feb 18, 2009 ~ Application received by CPC-MISS Feb 23, 2009 ~ Sponsorship approved Mar 10, 2009 ~ Nairobi Kenya received PR application Mar 17, 2009 ~ Nairobi Kenya Started processing PR application Mar 25, 2009 ~ Received AOR letter (Date?) ~ Request to Re-Do Medicals/Police Clearance. Request to send in PP Jan 25, 2010 ~ Received Visa May 10, 2010, Visa issued Apr 13, 2010.
MAK 7 Months
~ Application sent to CPC-MISS Aug 19, 2009 ~ Sponsorship approved Oct 16, 2009 ~ Nairobi Kenya Started processing PR application Nov 25, 2009 ~ Received AOR letter Dec 20, 2009 ~ PPR via email Feb 11, 2010
~ DM E-CAS Mar 1, 2010
~ Received Visa Mar 15, 2010
MARINE 5 Months
~ Application sent to CPC-MISS Dec 15, 2009 ~ Sponsorship approved Jan 22, 2010 ~ Nairobi Kenya received PR application (date?) ~ Nairobi Kenya started processing PR application Feb 9, 2010
~ Received AOR letter (Date?)
~ PPR and RPRF Mar 19, 2010 NOLA 1 Year 6 Months ~ Application received by CPC-MISS Jan 19, 2009 ~ Sponsorship approved Feb 10, 2009 ~ Buffalo US received PR application Mar 5, 2009 ~ Nairobi Kenya Started processing PR application Nov 24, 2009 ~ Received AOR letter Jan 16, 2010 ~ Request to Re-Do Medicals/Police Clearance. PPR sent Mar 2010 ~ Decision Made E-Cas Jun 1, 2010 ~ Approved through email Jun 15, 2010 ~ Picked Visa up Jul 13, 2010 ~ Landed Jul 31, 2010
SARUM ~ Application received by CPC-MISS (Date?) ~ Sponsorship approved Jan 26, 2009 ~ Nairobi Kenya received PR application Feb 2, 2009 ~ Nairobi Kenya Started processing PR application Feb 18, 2009 ~ Received AOR letter Mar 17, 2009 ~ Request to Re-Do Medicals/Police Clearance/PP Pictures Dated Nov 27, 2009 Received Dec. 11 2009. Request to send in PP in 1 month from other documents. ~ Decision Made E-Cas Jul 1, 2010 ~ Received Visa Jul 15, 2010 ~ Landed Aug 12, 2010
~ Was given until Dec 17, 2010 to land
KABA ~ Sponsorship approved Feb 06, 2009
~ Nairobi Kenya Started processing PR application Feb 23, 2009 ~ Received AOR letter (Date?) ~ Request to Re-Do Medicals and to send in PP within 60 days. Letter dated Jan.4 received Jan 25, 2010 ~ DM E-CAS May 17, 2010 ~ Received Visa Jun 1, 2010 TLB 1 Year 2 Month ~ Application sent to CPC-MISS May, 2009
~ Sponsorship approved Jun 22, 2009 ~ Quebec approved sponsorship and issued certificate Jul 17, 2009 ~ Nairobi Kenya received PR application Jul 1, 2009
~ Nairobi Kenya Started processing PR application (Date?) ~ Received AOR Jul 1, 2009 ~ Request to Re-Do Medicals. Request to send in PP two weeks from Medicals Mar 8, 2010
~ Decision Made E-Cas Jun 15, 2010 ~ Email Visa is ready for pick up Jul 15, 2010 ~ Visa picked up Jul 19, 2010 Issued Jun 9, 2010 MARVEL 1 Year 2 Months
~ Sponsorship approved July 14, 2009 ~ Nairobi Kenya Started processing PR application Sept 8, 2009 ~ Received AOR letter (Date?) ~ PPR dated Jan. 4 2010, Received Jan 9, 2010
~ DM on E-CAS - Sept 16, 2010
~ Picked up Visa and PP from Consulte Sept 21, 2010
CHOCOLATE 1 Year
~ Application mailed to CPC-MISS Dec 15, 2009
~ Sponsorship approved Jan 17, 2010 ~ Nairobi Kenya Started processing PR application Mar 30, 2010 ~ Request for additional supporting documents Jul, 2010 ~ Landed in Canada Dec 2010 (private email to Moja, she didn't share any further details)
HANSMAJA 1 Year 3 Months
~ Application sent to CPC-MISS Feb 5, 2010
~ Sponsorship approved Mar 3, 2010
~ Nairobi Kenya Started processing PR application Mar 12, 2010 ~ Received AOR letter Mar 28, 2010
~ Additional info requested letter sent Nov 3, received Nov 22, 2010
~ Sent Additional documentation Dec 16, 2010
~ Medicals re-done Jan 6, 2011
~ PPR Mar 21, 2011
~ DM E-Case Apr 12, 2011
~ Received Visa Apr 14, 2011
~ Landed May 10, 2011
~ Was given until Jan 5, 2012 to land THEBATOSAI 7 Months ~ Sponsorship approved Apr 8, 2010
~ Nairobi Kenya received PR application Apr 23, 2010 ~ Nairobi Kenya Started processing PR application Apr 28, 2010 ~ AOR letter dated Apr 28, 2010
~ Request for additional supporting documents Jul 14, 2010 ~ PPR Aug 30, 2010
~ DM E-CAS Oct 12, 2010
~ Received PP with Visa Oct 18, 2010
SIOMIMI 9 Months ~ Sponsorship approved May 17, 2010
~ Nairobi Kenya received PR application (Date?) ~ Nairobi Kenya Started processing PR application (Date?) ~ Received AOR letter (Date?)
~ DM Dec 2, 2010
~ Received phone call Dec 9, 2010
~Visa issued Dec 22, 2010
~ Landed Jan 17, 2011
~Was given until Jan 22, 2011 to land
CHARLENE 11 Months ~ Application sent to CPC-MISS May 7, 2010 ~ Application received by CPC-MISS (Date?) ~ Request from CPC-MISS for additional family info Jun 17, 2010 ~ Sent requested info Jul 23, 2010 ~ Sponsorship approved Aug 3, 2010
~ Nairobi Kenya started processing PR application Aug 12, 2010
~ Received AOR and Request for additional documents Aug 29, 2010
~ PPR Mar 10, 2011
~ PP dropped off on Mar 17, 2011
~ Picked up visa on Mar 28, 2011 TEWA 7 Months ~ Sponsorship approved Jun 22, 2010
~ Nairobi Kenya received PR application (Date?) ~ Nairobi Kenya Started processing PR application Jul 21, 2010 ~ Received AOR letter (Date?)
~ Request for additional documents Jul 26, 2010
~ PPR Dec 10, 2010
~ PP droped off Dec 14, 2010
~ Received Visa Dec 19, 2010
~ Landed Dec 27, 2010
MIEMIE 10 Months
~ Application sent to CPC-MISS Jun 30, 2010 ~ Sponsorship approved Aug 3, 2010 ~ Nairobi Kenya received PR application Aug 9, 2010
~ Nairobi Kenya started processing PR application Aug 16, 2010
~ Received AOR Aug 19, 2010
~ Sent additional documentation (without being requested) Oct 14, 2010
~ PPR dated Dec 14 received Dec 30, 2010
~ Dropped off PP Jan 7, 2011
~ PP picked up Mar 15, 2011
~ Was given until Apr 14, 2011 to land MAJI 7 Months
~ Application sent to CPC-MISS Jul 16, 2010 ~ Application received by CPC-MISS Jul 19, 2010 ~ Sponsorship approved Aug 20, 2010
~ Nairobi Kenya started processing PR application Sep 22, 2010
~ PPR via phone Nov 19, 2010
~ PP was droped off on Nov 24, 2010
~ Received visa Jan 31, 2011
~ Was given until Mar 2, 2011 to land.
SHASHA 6 Months
~ Application received by CPC-MISS Oct 1, 2010 ~ Sponsorship approved Nov 8, 2010
~ Nairobi Kenya started processing PR application Nov 23, 2010
~ Call to pick up AOR Dec 8, 2010
~ AOR received in Canada Dec 15, 2010
~ Additional info sent Dec 31, 2010
~ PPR by email Feb 3, 2011
~ Dropped off Police Check and PP Feb 22, 2011
~ DM E-Cas Mar 23, 2011
~ Received PP with visa Mar 31, 2011
~ Landed Apr 23, 2011 SACHMO 6 Months ~ Application received by CPC-MISS Oct 26, 2010
~ Sponsorship approved Nov 23, 2010
~ Nairboi Kenya started processing PR application Dec 29, 2010
~ Request for supporting documentation Jan 6, 2011
~ AOR received Jan 6, 2011 (Mauritius) Jan 14, 2011 (Canada)
~ PPR dated Jan 19, 2011 received Feb 3, 2011
~ PP received in Nairobi Feb 7, 2011
~ Nairobi received additional info requested Feb 10, 2011
~ DM E-Case Mar 1, 2011
~ Visa issued Feb 25, 2011
~ Received PP with Visa Mar 30, 2011
~ Given until Sep 2011 to land.
AMELIA 6 Months
~ Application received by CPC-MISS Oct 29, 2010 ~ Sponsorship approved Nov 25, 2010
~ Nairobi Kenya started processing PR application Dec 22, 2010
~ AOR received Jan 24, 2011 (Tanzania)
~ PPR dated Jan 27, 2011 received Feb 11, 2011
~ Mailed additional info requested Feb 8, 2011
~ Quebec Selection Certificate obtained Mar 24, 2011 (42 working days)
~ Received PP with Visa Mar 31, 2011
~ DM on E-Cas Mar 31, 2011
~ Landed Apr 4, 2011
~ Was given until Jun 24, 2011 to land **(Application In Process)** ZUBAIDA 1 Year 8 Months ~ Application sent to CPC-MISS Aug, 2009
~ Application received by CPC-MISS Oct 19, 2009
~ Sponsorship approved DATE?
~ Nairboi Kenya started processing PR application DATE?
~ Request for additional documentation Feb 17, 2010, received Mar 26,2011
~ Submitted additional documentation May, 2010
~ Request to re-do Medical/Police, Mail PP 1month after, Jul, 2010
~ PP not accepted
~ Application received by CPC-MISS Nov 23, 2009
~ Sponsorship approved Dec 17, 2009 ~ Nairobi Kenya received PR application Dec 29, 2009 ~ Nairobi Kenya Started processing PR application Jan 20, 2010 ~ Received AOR Feb 4, 2010, dated Jan 25, 2010 ~ Request to re-do Medicals and send PP 1month later Oct 15, 2010
VICTORY 1 Year 5 Months
~ Application sent to CPC-MISS Jan 13, 2010 ~ Sponsorship approved Mar 9, 2010 ~ Nairobi Kenya started processing PR application Mar 18, 2010 ~ Received AOR letter May 2010
~ MP contacted Nairobi, Interview waived Jan 10, 2011
~ PPR, re-do Medicals/Police Mar 30, 2011
SHAYO 1 Year 2 Months
~ Application sent to CPC-MISS Apr 15, 2010 ~ Request for additional info May 19, 2010 ~ Application re-sent to CPC-MISS Sep 22, 2010
~ Sponsorship approved Sep 24, 2010 ~ Nairobi Kenya started processing PR application Oct 4, 2010
~ AOR received Dec 24, 2010
~ Sent additional documentaion Jan 20, 2011
~ PPR, re-do Medicals/Police Mar 16, 2011 TITINA 1 Year
~ Application sent to CPC-MISS Jun 15, 2010
~ Application received by CPC-MISS Jun 16, 2010 ~ Sponsorship approved Jul 21, 2010 ~ Nairobi Kenya started processing PR application Aug 10, 2010
RIDAK 8 Months ~ Application received by CPC-MISS Oct 6, 2010
~ Sponsorship approved Nov 7, 2010
~ Nairboi Kenya started processing PR application Dec 6, 2010
~ AOR received Dec 10, 2010
JMA 7 Months
~ Application received by CPC-MISS Nov 1, 2010 ~ Sponsorship approved Dec 1, 2010
~ Nairobi Kenya started processing PR application Jan 5, 2011
~ AOR received Jan 13, 2011
~ Mailed additional info requested Feb 20, 2011
TIGANA 5 Months GATO 4 Months
~ Application received by CPC-MISS Feb 9, 2011
~ Sponsorship approved Mar 8, 2011
~ Nairobi Kenya received PR application Mar 11, 2011
SEDUM 4 Months ~ Application received by CPC-MISS Feb 23, 2011
~ Sponsorship approved Mar 23, 2011
~ Nairboi Kenya received PR application Apr 1, 2011 **(Applications Refused)** Edited by Moja - 27 May 2011 at 5:45pm |
|